1. WIND MONITORING PROGRAMME
A. GOVERNMENT WIND MONITORING SCHEME
MPUVN has
undertaken the task of wind monitoring at any place in the
state of Madhya Pradesh with the technical and financial
support of CWET/MNRE.at Present four wind monitoring
Stations are operational at Betul, Satna & Raisen District
.in Madhya Pradesh Following sites are found suitable for
power generation by Wind Energy
S.No. |
Site |
Dist. |
1 |
Jomgodrani |
Dewas |
2 |
Kukru |
Betul |
3 |
Mahuriya |
Shajapur |
4 |
Mamatkheda |
Ratlam |
5 |
Nagda |
Dewas |
6 |
Sendhwa |
Sendhwa |
7 |
Bariyalpani |
Barwani |
B. PRIVATE WIND MONITORING SCHEME
-
Permission for carrying out wind monitoring at self
identified locations by the private institutions is
being given by MPUVN on a first come first serve basis.
- For
identification of sites, Survey of wind potential
carrying out feasibility studies the prospective
entrepreneurs can select any site anywhere in Madhya
Pradesh except the areas under previous monitoring as
given in this programme.
- The
concerned parties are the responsible to carry out the
entire work of wind survey and monitoring finding out
wind power potential and carry out feasibility studies
at their cost. the parties are being allowed to carry
out wind monitoring and other survey and investigation
only in the area allotted to them.
- The
proposal is governed under the policy notifications
issued by MP Government and MNRE circular no.
51/9/2007-WE dated 20.06.2008 for wind measurement &
subsequent development by private sector.
- After
completing wind monitoring, survey and submitting the
feasibility report, if it is found viable to establish
the wind farm project, then the party will be required
to submit separate application in prescribed format to
MP Urja Vikas Nigam Ltd., along with detailed
feasibility report Registration and Processing fee for
project which may be considered for according 'in
principal' approval to set up the wind farm project.
- In the
case that the site is found feasible as per norms for
the establishment of wind energy projects, then the
following conditions apply:
a. Up to a radial distance of 5 km from mast: The
private party which has monitored the wind data on the
site has the first right of refusal to establish a wind
energy project. The project has to be registered with
MPUVN within 18 months of date of grant of permission for
installation of mast.
b.Between redial distance of 5-10 km from the mast:
MPUVN shall have the sole right to allow and register
other developers to set up wind power projects in the
area falling between 5-10 km redial distance from the
proven anemometry mast on the basis of the first come
first serve basis.
2. WIND POWER PROJECT
·
The Government of Madhya Pradesh has been
promoting the setting up of Renewable Energy based power
plants including wind through various policy initiatives
and incentives for the investors/developers.
·
The Government of Madhya Pradesh has issued
the Incentive Policy for encouraging generation of power
in Madhya Pradesh through Non-conventional Energy Sources
(2006). The policy provides incentives for installation of
wind power projects in Madhya Pradesh.
·
Wind power project proposal are being
accepted at potential sites where wind power Density (WPD)
is equal or above 200 W/m2 above 50 mtr ground
level
·
An Investor /Developer has to submit an
application to MPUVN in the prescribed format for the
project site, along with a non-refundable registration fee
of Rs. 50,000 per MW in the form of DD/Banker's cheque.
·
The project may be proposed on forest,
Revenue, Private Land. The land can be made available to
the party under provision of Revenue Deptt circular no.
F-16-3/93/7/2A dated 06.09.2010 & MOEF Guidelines (i) F
No. 8 - 84/2002-FC dtd 10.11.03 & (ii) F No. 8-84/2002-FC
dtd 14.05.04 under Forest conservation act 1980.
·
If the DPR submitted by the party found ok
the proposal will be sent to MP Govt. for necessary
approval. The party has to complete the project as per the
provision the timeline of the Policy dated 17.10.2006.
At present install capacity of wind Power
Project is to 213.79 MW.The details are under On the
Details of wind power projects proven sites
following wind power project have been
installed to till date
S.No |
Name of Power
Developers |
Site |
Capacity
(in MW) |
1 |
M/s MP Winfarm Ltd., Bhopal |
Jamgodrani, Dist.Dewas |
13.05 |
2 |
M/s Kalani Industries Ltd., Indore |
Dewas, Dist.Dewas |
1.84 |
3 |
M/s Goetze Financial Services, New
Delhi |
Jamgodrani Dist.Dewas |
5.98 |
4 |
M/s Suzlon Energy Ltd., Pune |
Nagda, Dist. Dewas |
6.25 |
5 |
M/s Suzlon Energy Ltd., Pune |
Nagda, Dist.Dewas |
6.25 |
6 |
M/s Suzlon Infrastructure Ltd. Pune |
Nagda, Dist.Dewas |
3.05 |
7 |
M/s Dhar Automotives Pvt. Ltd.,
Indore |
Jamgodrani Dist.Dewas |
0.230 |
8 |
M/s NEPC India Ltd./M/s Southern Wind
Farms Ltd., Chennai |
Sujapur, Dist.Ratlam |
4.95 |
9 |
M/s SE Energy Park Ltd., Pune |
Jaora, Dist.Ratlam |
4.8 |
10 |
M/s Enercon India Ltd., Mumbai |
Nagda, Dist.Dewas |
9.6 |
11 |
M/s Pioneer Wincon Ltd., Chennai |
Jaora, Dist.Ratlam |
4.00 |
12 |
M/s MP Winfarm Ltd., Bhopal |
Nagda, Dist.Dewas |
15 |
13 |
M/s Enercon India Ltd., Mumbai |
Ratedi, Dist.Dewas |
Proposed 91.2
Installed 51.2 |
14 |
M/s Suzlon Energy Ltd., Pune |
Palsodi, Dist.Ratlam |
32.7 |
15 |
Demo Project |
Kheda Distt Dhar |
0.59 |
16 |
Suzlon Energy Ltd |
Palsodi Ratlam |
9.6 |
17 |
Southern wind farms Ltd. |
Ratlam |
6.00 |
18 |
M/s Suzlon Energy Ltd |
Ratlam |
10.2 |
19 |
M/s Suzlon Energy Ltd |
Palsodi Ratlam |
6.00 |
20 |
M/s Suzlon Energy Ltd |
Mahuria Shajapur |
22.50 |
|
|
Total |
213.79 |
Year Wise Installation
Upto
2003-2004 21.69 MW
2004-2005 6.25 MW
2005-2006 11.20 MW
2006-2007 17.45 MW
2007-2008 69.00 MW
2008-2009 25.1 MW
2009-2010 16.6 MW
2010-2011 46.50 MW
Total 213.79 MW
Status of proposal for wind power
project
Commisssioned Project at Suzlon
Commisssioned Project Dewas
Commisssioned Project Dhar
Commisssioned Project on All company
Commisssioned Project Ratlam
Company wise status of wind project
Distt. Wise Status of Wind Power Project
RFP for Wind Power Project
wind power project Commissioned, regd
|